The full library. Filter by pillar or by what still needs a decision. Approve puts a post on the Feed plan. Needs changes takes it off and moves it to the top for Claude. Make it an ad adds it to the Ads tab, where it gets its own approval.
Ideas to build
Got an idea for a post? Add it here. Claude builds it into the library on the next pass.
How we sound
Approved posts land here in the order they'll go out. Set the first post date and how often to post. Use the arrows (or drag tiles on desktop) to reorder, skip a date, or send a post back to review. Posts pinned to a date keep it. The phone shows how the Instagram grid will look, newest at top left.

Offices, coworking and meeting rooms on the Fox River. Two campuses in St. Charles, IL.
Pillar mix
Only posts marked as ads show here, in their ad cut: the same piece plus an end card with the call to action. An ad is approved separately from its organic post, because its copy and rules differ. Switch sizes to check every placement.
Everything a person needs to confirm before a post goes out or an ad runs: assumptions Claude made, offers that need a yes, and things that disagree in N2's own materials.